New main line

I agonized over how to make a pun in the title that used pipe, tube, or hole, and eventually gave up. Not because I couldn’t think of any, but rather better taste prevailed.

Anyway, this weekend I replaced the main water line from the city’s meter to my shutoff inside the basement. It was a keystone project that effectively held up 4 other major things we’d like to complete, so once I pass inspection (assuming I do), a cascade of new projects will shower on to our summer weekends.

Unlike some friends I know, I don’t have access to excavating equipment. I dug the trench from the house to the fence, and my parents somehow got roped in to digging from the sidewalk to the meter. All told, the digging and tunneling under the sidewalk took 5 hours. The plumbing then took about 30 minutes. I love pex.

Well, except the part where I was 1 ring short and had to drive all the way out to Parkrose Hardware to buy another. 30 minutes of driving for a 25 cent part. Oh well. Got back, spent another five minutes plumbing, then had a home brew (that plumbing still worked) before turning on the water. Everything worked great. No leaks, more pressure, and a big hole in the ground.

Now I’m waiting for the inspection. This is the first time I’ve gotten permits for anything (shhh) and I’m amazed at how easy the process was. The city of Portland has an online form for smaller permits (plumbing, mechanical, electrical) and I was able to submit and pay for a permit, as well as receive a PDF of the completed permit in under 15 minutes. Damn! I’m a little nervous the inspector is going to want me to change the configuration of the pipe as it connects to the service, so Ella and I might go to the hardware store this morning before the inspector shows to buy the parts, or we might just stay here and telecommute. Plus, I’m nervous about all the middle school kids walking by my trench. I’ve got it covered, but after watching all the New Seasons customers walk over the trench, I have a pretty low estimation of people’s courtesy and intelligence. Someone drove over the plywood I had set out to mark the work site. I watched like 10 people (most of them adults) walk over the covered hole, oblivious to the giant piles of dirt on either side. Jackass entitled liberals…

One thought on “New main line”

  1. What are you complaining about not having an excavator for, sounds to me like you made your parents dig the hole. Shame on you. So your allowed to hook up to the city’s water meter without having a certified contractor make the actual connection? I wonder why were not allowed to hook up to storm water lines on our own then. Anyway, nice work! Tell your parents I am impressed. So whats next on the project list now that you have the water pressure taken care of? As far as your inspection, I would not worry to much about it, besides the fact that it looks like you guys did a very professional job, there are always ways around them. I once worked for a developer that “used” to keep an opened jar of 100 dollar bills around precisely for those occasions. I’m thinking a cup of coffee and a bagel with cream cheese should have the same affect. Again, nice work Freed’s